An emergency road closure between Glen Maye and Dalby has been extended for up to four weeks after engineers discovered a large void beneath the carriageway.
The A27 remains closed between Glen Maye and Dalby and is now expected to stay shut until December 15 while investigations and repair plans continue.
According to Highway Services, what initially appeared to be a relatively small sinkhole on the seaward side of the road has revealed a much larger problem beneath the surface.
Officials say the visible hole measures around five square feet, but investigations found the ground beneath the road has washed away to a far greater extent.
A void extending towards the centre of the carriageway has been discovered at a depth of between eight and ten feet.
Bigger Than First Thought
The roadside retaining wall has also been undermined, creating what authorities describe as a serious risk to road users.
The collapse is located near the Ballalonna culvert, close to Ballalonna farmhouse. Early investigations suggest water runoff may have eroded material around the culvert, leading to the failure of the road structure.
Structural engineers have attended the site and are now developing a plan to repair the damage.

Highway Services acknowledged the significant impact the closure is having on residents in Dalby, particularly as the alternative route can be affected by winter weather conditions.
Additional barriers are being installed around the affected area and drivers are being warned not to attempt to pass through the site.
Highway Services said the carriageway remains unstable and stressed that motorists must not try to bypass the closure.
Alternative Routes
Mobile matrix signs are being installed at Patrick Road Corner, Patrick and the Roundtable to advise motorists of the closure and direct traffic onto alternative routes.
Traffic travelling to Glen Maye is being advised to approach from the Patrick and Peel direction, while traffic heading to Dalby should use the route via the Shoulder Road and Roundtable.
Bus users are also being urged to check with Bus Vannin for service alterations.
Highway Services said further updates will be issued as more information becomes available and warned that the duration of the closure may still need to be revised depending on repair requirements.



