Valve replacement works are now underway at Clypse Reservoir, starting today and expected to be completed by the end of October.
While the contractor replaces the failed valves at the base of the dam, Manx Utilities staff will carry out ground maintenance along the overflow channel and support the contractor as needed.
For public and worker safety, paths around Clypse Reservoir will remain closed throughout the works which will be done between 8am to 5pm.
Kerrowdhoo Reservoir remains open and access is unaffected.


